LIMNMEDIA - First Hole
Every system has a moment where it stops being an idea and becomes a thing. For LIMNMOCO, this is that moment.
LIMNMOCO Build — First Hole Drilled
These images show the first hole drilled in the cross brace member of the track assembly. It’s a small step, but it marks the transition from planning and layout into physical construction.
This phase is focused on the track system, which will form the base linear axis. The cross brace is part of establishing alignment across the rails, structural rigidity, and repeatable spacing for future components.
At this stage, the goal is not perfection—it’s establishing a reliable reference and beginning to validate the build process.
There’s something important about this step. Before this, everything lives in sketches, measurements, and intent. After this, every decision starts to accumulate physically—holes, tolerances, spacing, and alignment all begin to matter in a new way.
This is the beginning of the LIMNMOCO build.
More to follow as the track assembly comes together.
— Christopher
LIMNMEDIA
Christopher Weinberg
Christopher Weinberg is the founder of LIMNMEDIA, where he develops motion control systems, production workflows, and educational tools focused on stop-motion and hybrid filmmaking. With over 15 years of experience in production, his work centers on making complex techniques more accessible through practical engineering and open development. He is currently building LIMNMOCO, a modular motion control system designed for flexible, real-world use.
No comments yet. Login to start a new discussion Start a new discussion