LIMNMEDIA - First Hole

Every system has a moment where it stops being an idea and becomes a thing. For LIMNMOCO, this is that moment.

 · 1 min read

LIMNMOCO first hole drilled LIMNMOCO first hole drilled

These images show the first hole drilled in the cross brace member of the track assembly. It’s a small step, but it marks the transition from planning and layout into physical construction.

This phase is focused on the track system, which will form the base linear axis. The cross brace is part of establishing:

  • alignment across the rails
  • structural rigidity
  • repeatable spacing for future components

At this stage, the goal is not perfection—it’s establishing a reliable reference and beginning to validate the build process.

There’s something important about this step. Before this, everything lives in sketches, measurements, and intent. After this, every decision starts to accumulate physically—holes, tolerances, spacing, and alignment all begin to matter in a new way.

This is the beginning of the LIMNMOCO build.

More to follow as the track assembly comes together.

— Christopher LIMNMEDIA


CW

No comments yet.

Add a comment
Ctrl+Enter to add comment